Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

Quincy Loop North PD&E Study

FDOT office in Chipley
Project photo
Project Map

Project Details

The purpose of this project is to provide an east-west connection between SR 12 and SR 267, east of Quincy. The proposed connection would improve existing conditions on SR 12 within the Quincy / Gadsden County area and especially the historic district of Quincy. The purpose of the proposed connection is to alleviate heavy truck traffic through the Quincy business district by serving as an alternative route for a new roadway that redirects traffic to the north of Quincy. Redirection of the truck traffic will: decrease congestion, improve safety for motorists and pedestrians, preserve the historic downtown area, and improve overall access to SR 12 and points beyond. The PD&E Study process involves the following tasks: data collection, public involvement, engineering analysis, environmental evaluations, local, state and federal agency coordination, and compliance with the National Environmental Policy Act (NEPA).

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 218946-6
Work Type New Road Construction
Status PRE-CONST.UNDERWAY
Project Limits
from SR 12 to SR 267 (Bainbridge Highway)
Project Length 3.892 miles
Project Manager Sherry Alaghemand

Project Documents

Affected Areas

Roads Quincy Loop North
Counties Gadsden
Cities Quincy

Public Meetings

Contact

Sherry Alaghemand
850-330-1510

Data current as of 6/27/2018.