Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

SR 83 (US 331) from Edgewood Circle to SR 8 (I-10)

FDOT office in Chipley
Project photo
SR 83 US 331 Multi-Lane Reconstruction

Project Details

This capacity project primarily consists of widening SR 83 (US 331) from a two-lane undivided roadway to a four-lane divided roadway from Edgewood Circle to SR 8 (I-10).

The proposed typical will consist of two (2) 12-foot travel lanes in each direction separated by a forty (40) foot grassed median. Twelve-foot (12’) outside shoulders (five-foot (5’) paved) are proposed with eight-foot (8’) unpaved inside shoulders.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 220663-3
Work Type Right Of Way - Future Capacity
Status ROW ACQUISITION BEG.
Project Limits
From Edgewood Circle to SR 8 (I-10)
Project Length 4.673 miles
Project Manager William Howell

Project Documents

Affected Areas

Roads SR 83, US 331
Counties Walton

Public Meetings

Contact

William Howell
866-855-7275

Data current as of 3/30/2018.