Northwest Florida Roads
Skip to main content

SR 83 US 331 Multi-Lane Reconstruction
Project Details
This capacity project primarily consists of widening SR 83 (US 331) from a two-lane undivided roadway to a four-lane divided roadway from Edgewood Circle to SR 8 (I-10).
The proposed typical will consist of two (2) 12-foot travel lanes in each direction separated by a forty (40) foot grassed median. Twelve-foot (12’) outside shoulders (five-foot (5’) paved) are proposed with eight-foot (8’) unpaved inside shoulders.
Note: All information is preliminary and subject to change without notice.
Project Overview
Project Number
220663-3
Work Type
Right Of Way - Future Capacity
Status
ROW ACQUISITION BEG.
Project Limits
From Edgewood Circle to SR 8 (I-10)
Project Length
4.673 miles
Project Manager
William Howell
Project Documents
Affected Areas
Roads
SR 83, US 331
Counties
Walton
Public Meetings
Contact
Data current as of 3/30/2018.