US 98 from Emerald Bay Drive to Tang-O-Mar Drive

FDOT office in Chipley
Project photo
US 98 Widening Project

Project Details

Work to widen and improve U.S. 98 in Walton County between Emerald Bay Drive to Tang-O- Mar Drive began fall 2016. In June 2018, all travel lanes were shifted to the north side of U.S. 98 to allow crews to construct the new eastbound travel lanes. The $42 million project includes widening the roadway from four to six travel lanes, new bicycle lanes and sidewalks on each side of the roadway and drainage system improvements.

The speed limit has been reduced to 45 mph. Slow down during inclement weather and be alert of water on the roadway. Use caution when traveling on the outside travel lanes. Drivers making right turns will be slowing down to access business driveways and side streets.

Traffic Impacts

Use caution when entering or exiting business driveways and side streets located on the south side of US 98 near active near active work zones. Drivers are only permitted to make right turns from side streets and business driveways. Left turns will not be permitted at these locations. U-turns for non-commercial vehicles will only be permitted at signalized intersections.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 414132-4
Work Type Add Lanes & Reconstruct
Status UNDER CONSTRUCTION
Project Limits
From Emerald Bay Drive to Tang-O-Mar Drive
Project Length 3.645 miles
Estimated Completion Summer 2020
Est. Construction Cost $42.140 M
Project Manager William Timpner

Project Documents

Affected Areas

Roads SR 30, US 98
Counties Walton
Cities Destin, Miramar Beach

Public Meetings

Contact

William Timpner
850-836-5700

Data current as of 7/31/2018.