Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

SR 87 Connector PD&E Study

FDOT office in Chipley
Project photo
SR 87 Connector Study Area

Project Details

The general objective of this PD&E Study is to provide and document information necessary for the FDOT to reach a decision on the type, design and location of improvements for a SR 87 Connector. The project limits include the intersection of SR 87 South and Bent Tree Road, westward to the intersection of SR 10 (US 90) and Glover Lane, and northwardly to the intersection of SR 87 North and Southridge Drive in Santa Rosa County, Florida.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 416748-3
Work Type PD&E Study
Status PRE-CONST.UNDERWAY
Project Limits
from SR 87 south at US 90 to SR 87 north at Southridge Road
Project Length 13.949 miles
Estimated Completion Fall 2016
Project Manager Peggy Kelley

Project Documents

Affected Areas

Roads SR 87
Counties Santa Rosa
Cities Milton

Public Meetings

Contact

Peggy Kelley
850-330-1517

Data current as of 3/30/2018.