FDOT office in Chipley
Project photo
Project Map

Project Details

The intent of this project is to widen and realign approximately six miles of SR 388 and east of Burnt Mill Creek to SR 77. The existing two-lane roadway will be reconstructed as a four-lane divided roadway and will include a 12-foot shared-use path along the south side of the roadway. The eastern 1.5 miles of the project will realign SR 388 northward to intersect with SR 77 at CR 388 and a cul-de-sac will be constructed on existing SR 388 approximately 1 mile west of the existing SR 388 intersection at SR 77 and Edwards Road. Right-of-way and construction are not funded in the current FDOT Five-Year Work Program.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 424464-7
Work Type Prelim Eng For Future Capacity
Status PRE-CONST.UNDERWAY
Project Limits
from east of Burnt Mill Creek to SR 77
Project Length 6.477 miles
Project Manager Jon McClain

Project Documents

Affected Areas

Roads SR 388
Counties Bay

Public Meetings

Contact

Jon McClain
850-415-9020

Data current as of 06/08/2017.