Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

SR 20 (US 27) Apalachee Parkway at SR 265

FDOT office in Chipley
Project photo

Project Details

The intent of this project is to reconfigure the intersection in order to improve motorist and pedestrian safety within the intersection. The existing eastbound and westbound right turn lanes on the service roads will be removed and new right turn lanes constructed on SR 20 (Apalachee Parkway). Additional improvements consist of extending the eastbound left turn lanes to northbound SR 265 (Magnolia Drive), adding a marked crossing on the east leg of the intersection, modifying the crossing on the west leg to make it a single crossing movement, minor modifications to the existing stormwater collection system, and signing, pavement marking, signalization and lighting improvements.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 438148-1
Work Type Intersection Improvement
Status BIDS RECEIVED
Project Limits
State Road 20 (US 27/Apalachee Parkway) at State Road 265 (Magnolia Drive)
Project Length 0.081 miles
Project Manager Howard Hodge, P.E.

Project Documents

Affected Areas

Roads SR 20, Apalachee Parkway, Magnolia Drive
Counties Leon
Cities Tallahassee

Public Meetings

Contact

Howard Hodge, P.E.
850-526-2291

Data current as of 10/13/2017.