EMERGENCY INFORMATION - To be displayed on a situational basis. Hidden otherwise. EMERGENCY INFORMATION - To be displayed on a situational basis. Hidden otherwise.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

Web Application


SIGN DETAIL  CF399
This page lists detail information about the permit, facing, sign and section for the tag. The information displayed on this page is from the Florida Dept. of Transportation Outdoor Advertising Database.

 

 
Location Information:
 Region 3  County Orange
 State road 408  Local name East-West Expressway
 US Route -  Class Primary
 RCI Section 75008000  Direction East
 Section begin  SR50
 Section end  S R417 NB RAMP
 
Structure Information: Permits on this Structure: CF400 CF399 CE320 CE321
 Milepost 1.026  Conforming? Yes
 Section side Right  Date built 11/28/2007
 Latitude 28.5478813888889  Configuration V-Shaped
 Longitude -81.4479333333333  Material Steel
 Lights Yes  # Supports 1
 Height 35 feet  Date removed -
 Structure is   0.027 miles West of Pine Hills Road
 View Map   View in Google Maps
 
Permit (facing) Information:
 Issue date 08/13/2007    Tag# CF399
 Date built 11/28/2007  Permit status Active  
 Sign reads Right  Square feet 672  
 HAGL 49 feet  Date removed -  
 Inventory picture  View Picture
 Permittee  CLEAR CHANNEL - ORLANDO
 Veg. Mgmt. Permit#  
 View Zone   Statutory View Zone as per 479.106(6), (a) & (b), Florida Statutes
Tag history:
Tag# CF399