EMERGENCY INFORMATION
- To be displayed on a situational basis. Hidden otherwise.
Florida Department of
TRANSPORTATION
E-Updates
|
FL511
|
Mobile
|
Site Map
Home
About FDOT
Contact Us
Offices
Maps & Data
Performance
Projects
Web Application
Database Home
/
Contact Us
/
Download Data
/
Information
/
Reports
/
Right of Way Web Site
SIGN DETAIL
CM177
This page lists detail information about the permit, facing, sign and section for the tag. The information displayed on this page is from the Florida Dept. of Transportation Outdoor Advertising Database.
Enter Tag #:
Location Information:
Region
2
County
Suwannee
State road
93
Local name
I-75
US Route
-
Class
Interstate
RCI Section
37130000
Direction
North
Section begin
Columbia County Line
Section end
Hamilton County Line
Structure Information:
Permits on this Structure:
CM177
CM176
Milepost
1.056
Conforming?
Yes
Section side
Right
Date built
02/01/1965
Latitude
30.317212
Configuration
Back to Back
Longitude
-82.806595
Material
Steel
Lights
Yes
# Supports
1
Height
56 feet
Date removed
-
Structure is
1.056 miles North of COLUMBIA COUNTY LINE
View Map
View in Google Maps
Permit (facing) Information:
Issue date
-
Tag#
CM177
Date built
02/01/1965
Permit status
Canceled
Sign reads
Left
Square feet
396
HAGL
38 feet
Date removed
-
Inventory picture
View Picture
Permittee
GATE PETROLEUM CO
Veg. Mgmt. Permit#
View Zone
Statutory View Zone as per 479.106(6), (a) & (b), Florida Statutes
Tag history:
Tag# CM177
Tag# CK276
Tag# BI916
Tag# 12440