EMERGENCY INFORMATION
- To be displayed on a situational basis. Hidden otherwise.
Florida Department of
TRANSPORTATION
E-Updates
|
FL511
|
Mobile
|
Site Map
Home
About FDOT
Contact Us
Offices
Maps & Data
Performance
Projects
Web Application
Database Home
/
Contact Us
/
Download Data
/
Information
/
Reports
/
Right of Way Web Site
SIGN DETAIL
BV757
This page lists detail information about the permit, facing, sign and section for the tag. The information displayed on this page is from the Florida Dept. of Transportation Outdoor Advertising Database.
Enter Tag #:
Location Information:
Region
2
County
Taylor
State road
30
Local name
US98
US Route
98
Class
Primary
RCI Section
38090000
Direction
East
Section begin
Jefferson County Line
Section end
SR 20
Structure Information:
Permits on this Structure:
BV757
BV756
Milepost
4.499
Conforming?
Yes
Section side
Right
Date built
04/01/1993
Latitude
30.1409627777778
Configuration
Back to Back
Longitude
-83.9007588888889
Material
Wood
Lights
No
# Supports
3
Height
11 feet
Date removed
-
Structure is
0.008 miles West of Econfina River Rd {4.507 mp]
View Map
View in Google Maps
Permit (facing) Information:
Issue date
-
Tag#
BV757
Date built
04/01/1993
Permit status
Active
Sign reads
Right
Square feet
118
HAGL
3 feet
Date removed
-
Inventory picture
View Picture
Permittee
ECONFINA RESORT INC
Veg. Mgmt. Permit#
View Zone
Statutory View Zone as per 479.106(6), (a) & (b), Florida Statutes
Tag history:
Tag# BV757
Tag# BN620